Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, suggests that Not Right First Time (NRFT) refers to: ‘The first measure under the QCD (Quality, Cost and Delivery) approach to improved production performance, it measures a product’s ability to match a specification. It is typically expressed in ‘number of defect parts per million’ with a defective unit defined as one that does not conform to specification and may be scrapped or reworked.’
QCD: measuring manufacturing performance, Published by the Department of Trade and Industry in 2004 suggested that Not Right First Time (NRFT) measures a product’s ability to match a specification and is expressed in number of defect parts per million.
Not right first time = 10^6 X (Quantity of defective units / Total quantity of units supplied)
NRFT can be measured internally and externally in the production cycle:
- Internally – defective units identified within the production process.
- Externally – defective units that are identified outside the production process, either from the supplier or at the customer’s site.
A defective unit is a unit that does not conform to specification and may be scrapped or reworked.
[edit] Related articles on Designing Buildings
Featured articles and news
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
UK Net Zero Carbon Buildings Standard Sept update
Pilot version for testing and feedback on its adoption due.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
National Retrofit Hub takeover of Net Zero stage
At Birmingham UK Construction Week in October.
AT Awards 2024 finalists announced
With more to come, prior to the Awards ceremony in October.
London construction cools as hotspots appear nationally
Increases in the East of England, Yorkshire and Scotland.
ARB proposals for a new Architects Code
Announced in the shadow of the final Grenfell Inquiry report.
Combining human creativity and tech innovation now and in the future
Building automation and control systems market study
BSRIA 2024 North America BACS software & services.
Impact of digital technology on productivity in construction
New CIOB academy guidance for companies of all sizes.